CRITICAL DEADLINE 72 HOURS · Blackwell, Reginal — PC § 1054.1 deficiency-notice response due Tue 5/5 5:00 PM PT DDA Sjoberg · 25-CR-007675 · letter staged in admin@ Drafts pending JWN sign-off Jump to matter ↓

Discovery — cross-matter intake & status

Inbound discovery activity, JWN approval queue, producer batches, and PC § 1054.1 checklist coverage for discovery@noonanlawoffices.com.

Snapshot — 2026-05-28 04:30 UTC · live data + tracker xlsx as of 2026-05-01
LawTime — Discovery hero

At a glance LIVE

Matters tracked
33
31 Open · 2 Pending
Tracker coverage
8/33
25 matters still [needs-review]
Producer batches received
10
2 duplicates · 8 unique
Pending JWN approvals
2
outbound DA-facing — gate before send
Flagged chains
6
incomplete-chain / mid-stream pickups

🚨 Action Needed 19 open · 3 critical

Per-batch action items aggregated from DISCOVERY-RECEIPT.md files in Drive (via console/registry/discovery-action-items.json). Critical = credentials/expired; warning = expiring soon / partial / redaction; info = awaiting review/approval. Sorted by severity then deadline.

Action items today 8 items

JWN approval queue + variance / incomplete-chain / stale flags + outstanding § 1054.1 gaps with hard deadlines. Newest deadlines first. Click any row to jump to the matter.

Status by matter — sortable, searchable

All 33 active criminal matters. Click any row to expand inline — shows that matter's producer batches and § 1054.1 checklist row. [needs-review] rows are scaffolded — discovery hasn't been triaged yet on those matters.

Producer batches — newest first re-shares collapsed

Every inbound transmission, deduplicated by SHA-256 content. Blackwell's 3/3 + 3/25 + 4/17 transmissions are byte-identical re-shares of the same 69-file content set (Sjoberg pattern); shown as one row with a 3 transmissions badge — click to expand the individual transmissions.

Last 7 days — inbound velocity by producer

Daily receipt counts per producer in the trailing 7-day window. Snapshot only — rebuilt nightly by scheduled task. (Stale-producer alerts deferred to variance-loop v2.)

PC § 1054.1 checklist — coverage heatmap (all 33 matters)

15 categories × 33 matters. R received · P partial · O outstanding · Q unknown (no triage yet) · NA not applicable. Vertical scroll for the full set.

Received (R) Partial (P) Outstanding (O) Unknown (Q) N/A

Inbound producers — cumulative

Batches by producer (all-time)

Capacity model — projected at full coverage PROJECTED

What this dashboard will look like once all 31 matters have triaged discovery and the firm-wide § 1054.1 checklist is populated. Replace with live numbers as Christine + Jeremy back-fill matter-page Discovery-Status blocks.

Producer batches/month
~28
avg 1 batch every 1.1 days at full coverage
JWN approvals queue depth
3-5
target: never >5 outstanding for >7d
Median age of pending
2.5 d
approval-to-send latency target
Outstanding § 1054.1 cells
~110
31 matters × 15 categories minus N/A — target visibility on each

Projected status-by-matter distribution

At steady state, with 31 matters and post-arraignment discovery on all of them, the firm should see roughly:

How to read this: Today only 7 matters have any discovery triage. Projection assumes Christine completes the back-fill across all 31; the chart shows where each matter would land based on its current stage. Update once back-fill ships.

Operational notes